Stupid Road Construction
Sep. 11th, 2008 05:53 pmThey've been working on the road right outside my apartment (literally, my place is the last place you can turn before the road closes) since mid to late June. It's annoying because my most direct route to 316 (the road I take to work) is cut off. This means I have to go around adding five miles and, at times, up to 10 minutes onto my drive. There was a sign put up in July stating that the road would reopen 9-1-2008. It was soon after changed to 9-12-2008. Today when I drove in after work the sign read 11-1-2008. So annoying. I have no idea what they're doing to the read, but why is it taking two months longer than originally planned??